Notice Inviting Tenders

Perspective Plan
 
Business
 
Citizen

Projects
Building
Roads
Bridges
Water Supply
Sewerage / Sanitation
No Objection Certificate
Statistics
FAQ's
Citizen Charter
News
Downloads
Departmental Manual
Organization Structure
About Us
Feedback
Photo Gallery
Rest House

Business Section
Government Section

Search
You are Here: Citizen :: Roads

ROADS AND BRIDGES

ROADS
 
OBJECTIVES :- The objectives of Roads and Bridges sector in the Eleventh Five Plan 2007-12 were as follows:
  • Widening and improvement of State highways and major district roads by providing hot mix carpet.
  • Construction of bye-pass for towns to reduce congestion and accidents.
  • Construction of bridges/missing links for the economic upliftment of rural areas and reduction in traveling distances.
  • Construction, widening and improvement of rural roads.
PROPOSALS:- SCHEMES PROPOSED IN THE ANNUAL PLAN 2013-14:
 
1. BRIDGES
 
A. BRIDGES COMPLETED DURING THE YEAR 2012-13: The following bridges were completed during the year 2012-13:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
1
XIII
1
Re-Construction of two Nos. 8.00m span R.C.C. Slab culvert infront of St.Anthony Church along MDR No.10 in V.P. Siolim-Marna in Siolim Constituency
82.11
 
B. SPILLOVER WORKS OF THE YEAR 2012-13: The spillover works of the year 2012-13 in Annual Plan 2013-14 is as follows:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
2
VI
1
Construction of bridge connecting Benaulim & Sinquetim including approach road in Navelim constituency.
1107.92
VI
2
Construction of bridge connecting Cavellossim & Assolna including approach road in Navelim constituency.
6438.30
XIII
3
Construction of parallel bridge at Arpora-Baga on MDR 10 in Calangute Constituency
493.18
XXIII
4
Construction of 9 mt span culvert and approach between upper Harvalem and Gurukrupa at Sanquelim in Pale constituency
53.36
XXV
5
Construction of bridge across river Kushawati at Sulkornem in V.P. Caurem Pirla in Quepem constituency
140.98
XXV
6
Proposed bridge at Quepem over Kushawati river.
763.35
In addition to the above, there are various other spillover works in the State, of the year 2012-13 in the Annual Plan 2013-14.
 
C. NEW BRIDGES PROPOSED FOR THE ANNUAL PLAN 2013-14: The following new bridges are proposed to be taken up in the Annual Plan 2013-14:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
3
II
1
Const. of parallel new bridge connecting Ambewada to Tonca St.Estevam over Tributary of Mandovi River Village St.Estevam of Cumbharjua Const.
1054.00
XIII
2
Urgent repairs to RCC bridge at Marchikod Junaswada Mandrem on MDR 18 in Mandrem Constituency
215.00
XIII
3
Re-Construction and improvement of existing Tito bridge in V.P. Anjuna Caisua in Siolim Constituency
200.00
XVIII
4
Construction of high level road bridge across river Mandovi between Savoiverem & Cotambi including approaches in Goa.
2112.50
XVIII
5
Construction of 90mts long major bridge across river Khandepar including approaches Ambe-Dhullai in Sanvordem Constituency
797.00
XXV
6
Construction of RCC bridge connecting villages of Paroda & Avedem in Curchorem Constituency
728.00
In addition to the above, there are various other new bridges proposed to be taken up in the State, in the Annual Plan 2013-14. New bridges will be taken up as per the priority and approval of the Government.
 
2. STATE HIGHWAYS :
 
A. SCHEMES COMPLETED DURING THE YEAR 2012-13: The following schemes were completed during the year 2012-13:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
4
XVIII
1
Improvement,Widening including hotmix carpet of the mining affected state highway from Tisk to Usgao Circle in Ponda Constituency
511.88
 
B. SPILLOVER WORKS OF THE YEAR 2012-13: The spillover works of the year 2012-13 in the Annual Plan 2013-14 is as follows:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
5
VI
1
Hotmixing and widening of road from Arlem junction to Ravindra Bhavan (S.H.-5) in Fatorda Const.
84.12
XVIII
2
Improvement of riding surface of S.H.6 from Sanguem Court to Uguem in a length of 7.20 kms in Sanguem Constituency.
671.82
In addition to the above, there are various other spillover works in the State, of the year 2012-13 in the Annual Plan 2013-14.
 
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2013-14: The following new schemes are proposed to be taken up in the Annual Plan 2013-14:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
6
VI
1
Widening of road 4 lane from Ambora to Borim.
655.00
VI
2
4 laning of road from Arlem Junction to Ravindra Bhavan Junction.
650.00
XIII
3
Widening of State Highway from Karaswada junction to Tivim Panchayat i.e.Ch 0.00km to Ch 4.00kms in Tivim Constituency
553.42
XVIII
4
Widening & strengthening of SH-7 from Guddemol Junction to Sanvordem Tisk from Ch.14.30 Kms to 18.10 Kms in a length of 3.80 Kms in V.P.Sanvordem in Sanvordem Constituency.
705.48
XVIII
5
Widening & Strengthening of SH-7 from Savargal Junction to Guddemol Junction from Ch.10.30 Kms to 14.30 Kms in a length of 4.00 Kms in V.P Sanvordem in Sanvordem Constituency
656.04
XXIII
6
Improvement & hotmixing of Sh.No.2 chainage 6.00 to 9.40 km from RTO check post to Dodamarg road in Bicholim constituency.
173.18
XXIII
7
Improvement of road by widening and Hot mixing of SH3 from CH. 0.00 to 26.00 from Honda to Surla in Pale constituency
974.32
In addition to the above, there are various other new schemes proposed to be taken up in the State, in the Annual Plan 2013-14. New schemes will be taken up as per the priority and approval of the Government.
 
3. MAJOR DISTRICT ROADS:
 
A. SCHEMES COMPLETED DURING THE YEAR 2012-13: The following schemes were completed during the year 2012-13:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
7
XIII
1
Providing Hot Mix carpet from road MDR 6 from Cunchelim to Siolim Marna in a length of 6.90kms of Siolim Constituency
435.10
XIII
2
Improvement & hotmixing of Saligao Betim M.D.R No.9 for a length of 1380mts.(upto Saligao Seminary) in .P. Saligao in Saligao Constituency.
101.00
XVIII
3
Resurfacing of MDR-33 by providing hot mix carpet from Gaudsai to Satpal in a length of 6.00Kms in V.P.Sancordem in Sanvordem Constituency
292.50
XVIII
4
Resurfacing of MDR-33 by providing Hot mix carpet from Satpal to Mollem in a length of 4.40 Km in V.P. Sanvordem Constituency
214.25
XXIII
5
Impr. and Hot mixing of MDR 25 from Sanquelim to Navelim from Ch. 0.00 to 3.8km in Pale constituency
365.96
B. SPILLOVER WORKS OF THE YEAR2012-13: The spillover works of the year 2012-13 in the Annual Plan 2013-14 is as follows:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
8
VI
1
Imp. of riding quality with macadam & bituminous hotmix carpet of MDR from Dandora Cuncolim Bazar Savorcotto to Konkan Rly over bridge in Municipal area in Cuncolim Const.
338.45
VI
2
Wid. & prov. Hot mix carpet on MDR 42 from Chandor church ti Macazon border in V.P. Guirdolim in a length of 3.90kms under Cuncolim.
411.45
XIII
3
Providing hot mix carpet from MDR - 12 along Malim Betim via Salvador Do Mundo church in Aldona Constituency
110.15
XIII
4
Improvement & hot mixing of MDR - 14 (Mapusa-Moira-Aldona)in a length of 8.00 kms in Bardez Taluka
371.76
XVIII
5
Improvement,Widening and hot mixing of road from Bythakhol junction to Bethora junction in Shiroda Constituency
454.13
XVIII
6
Improvement,Widening and hot mixing of the bye pass road from Amigos Hotel to Bethora junction in Ponda Constituency
550.74
In addition to the above, there are various other spillover works in the State, of the year 2012-13 in the Annual Plan 2013-14.
 
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2013-14: The following new schemes are proposed to be taken up in the Annual Plan 2013-14:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
9
II
1
Improvement and widening of MDR III from Dona Paula to GMC Bambolim (M.D.R)
1000.00
II
2
Re surfacing by hotmixing various roads in Panaji
1000.00
VI
3
Reconstruction of cross drainages and providing protection wall on MDR 42 in in betwwen Kharsabhat to Almacruz in V.P. Chandor
300.00
VI
4
Imp & widening of MDR 47 from Varca Junction to Utorda Junction in Benaulim Constituency.
650.00
XIII
5
Improvement and hot mixing of road from Pernem to Korgao (MDR-17) and Pernem to Naibag (MDR-16) in Pernem Constituency.
360.00
XIII
6
Improvement of existing road by hot mixing from Chopdem to Mandrem MDR - 18 for length of 7070km in Mandrem constituency.
467.00
XVIII
7
Providing hot mix carpet to the MDR road from Bypass junction to Durbhat Ferry point and internal roads in Marcaim Constituency
465.12
XVIII
8
Improvement and providing hot mix carpet to the road from Banastari to Khandola in Priol Constituency
441.92
XXIII
9
Widening and improvement of MDR-23 (Bicholim-Ladfem-Dodamarg) road in a length of 9.10 km in Bicholim constituency.
592.00
In addition to the above, there are various other new schemes proposed to be taken up in the State, in the Annual Plan 2013-14. New schemes will be taken up as per the priority and approval of the Government.
 
4.1. RURAL ROADS:
 
A. SCHEMES COMPLETED DURING THE YEAR 2012-13: The following schemes were completed during the year 2012-13:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
10
II
1
Imp and widening of the existing roads and laying hotmixed bituminous/asphaltic concrete from NH4A via Funskool upto Gaundalim ferry in V.P Corlim in Cumbharjua Constituency.
152.21
II
2
Widening and improvement of balance roads in Chimbel V.P. in St.Cruz.
228.58
XIII
3
Improvement of various roads by providing hot-mix carpet in V.P.Amerem Khajne-Porascadem in Pernem Constituency.(For roads in Amerem & Khajne)
95.00
XIII
4
Improvement and hot mixing of road from Lions Club to C'Shell stores and from Hill top Hotel to Nine Bar and other Branch roads at Vagator roads at Vagator Anjuna in V.P. Anjuna-Caisua in Siolim Constituency.
95.00
XVIII
5
Providing hot mix carpet to the road to Khutiamol,Xel-Karmane,Babuliwada, Goval & Morkani-Bandol in a combined length of 6.06 Kms in V.P.Kirlapal Dabal in Sanvordem Constituency
179.16
XVIII
6
Improvement and providing hot mix carpet to the road from Marcel to Tonca in Priol Constituency
234.21
XXIII
7
Hot mixing of road from MDR 25 Junction to Maina Ferry road between Ch. 0.00 to 2250 at V.P Navelim in Pale constituency
58.2
XXIII
8
Improvement of road by hot mixing at Amona and Navelim Panchayat at Pale constituency
279.43
XXV
9
Improvement and resurfacing of road from Mashem to Loliem Panchayat via Agos in a length of 3.60kms in V.P. Loliem-Polem in Poinguinim constituency
89.00
XXV
10
Improvement and widening of road leading to Navodaya Vidhyalaya at Mastimol by laying hot mix carpet in a length of 2.60 kms in Canacona
115.47
B. SPILLOVER WORKS OF THE YEAR 2012-13: The spillover works of the year 2012-13 in the Annual Plan 2013-14 is as follows:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
11
II
1
Improvement to the existing roads laying hot mixed bituminous/asphaltic concrete from NH4A Bye pass junction to old NH4A junction near Chapel Baiguinim Old NH4A junction to Gurukal Colony NH4A Bye pass junction leading to Sunshine School Baiguinim V.P Old Goa in Cumbarjua Constituency.
157.48
II
2
Improvement to road leading to NH-17 Goa Velha by pass from Minguel Gonsalves and onwards to Manuel Estaves house at Moita in Village Panchayat St. Lawrence in St. Andre Constituency
55.08
VI
3
Streng. Of internal roads by providing BC carpet in Navelim Constituency
419.53
VI
4
Streng. & Hotmixing of road from Davorlim Junction to Khareband Bridge via KRC Station including branches in Margao Constituency.
523.50
XIII
5
Widening and Improvement of existing road by hot mixing from Primary Health Centre Tuem to Bhaidwada Korgao(4.30km) in V.P.Korgao in Pernem constituency.
227.14
XIII
6
Improvement & hotmixing of road from Candolim - Ximer to Baga bridge in V.P.Calangute in Calangute Constituency
210.69
XVIII
7
Improvement and Widening of road from NH4A junction at Khandepar to Water Treatment Plant at Opa/Codar in V.P.Curti Khandepar of Ponda Constituency
315.87
XVIII
8
Construction of road gutter and side protection to the road Avantinagar, Sainagar,Nanus and Palwada Usgao in Ponda Constituency
495.03
XXIII
9
Improvement and Hot mixing of road at Gaowada Velguem in Pale constituency
178.00
XXIII
10
Imp. & hotmixing of road from main road S.H. No.2 towards Sateri temple Kharpal in a length of 2.40 kms. At Kharpal in V.P Latambarcem in Bicholim constituency.
79.00
XXV
11
Improvement and resurfacing of road from Loliem church to Loliem bus stop via Peddem Gal in a length of 3.80kms in V.P. Loliem-Polem in Poinguinim
116.77
XXV
12
Improvement of road leading to Borimolwada and Kudai by providing hot mix carpet in a length of 5.13 km in Cola in Canacona constituency.
121.16
In addition to the above, there are various other spillover works in the State, of the year 2012-13 in the Annual Plan 2013-14.
 
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2013-14: The following new schemes are proposed to be taken up in the Annual Plan 2013-14:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
12
II
1
Land Acquisition for the work of construction of new by pass road with culvert from Taleigao to santa Cruz in Santa Cruz Constituency (proposal vide Sr. no 81 in 2012 budget)
524.00
II
2
Construction of new by pass road with culvert from Taleigao to Santa Cruz in Santa Cruz Constituency (proposal vide Sr. no 81 in 2012 budget)
2500.00
VI
3
Wid & Prov hotmix carpet to left out internal road in V. P. Guirdolim.
256.25
VI
4
Imp. Of various roads and construction of drainage of various internal roads in and around Mahaladmi Residency in V.P. Sancoale, in Cortalim Const.
246.13
XIII
5
Improvement and hotmixing of Assagao Panchayat main road from Kamat house junction at Sawantwaddo to Siolim-Assagao Border via Badem in V.P.Assagao,Bardez-Goa in Siolim Constituency
317.93
XIII
6
Land Acquisition for Construction of:-i) Road and parking lot from Kidear junction on MDR-10 to Baga bridge.ii)From Camelot Resort to Suraj Vaigankar's house.iii)From Camelot Resort to Calangute Baga main road to Government Primary School Sauntawado in V.P. Calangute Constituency.
759.48
XVIII
7
Improvement and B.T. of road to Santonawado in a length of 2.00 Km in V.P.Sanvordem in Sanvordem Constituency
324.48
XVIII
8
Providing AC carpet to bypass road from Kundaim NH4A Madkai Industrial estate in Marcaim Constituency
434.74
XXIII
9
L.A for parallel road exclusively for mining affected road village road in between Surla and Kudnem in length of 9.6 km in Pale constituency
111.15
XXIII
10
Construction of road from Vadaval Savardhat Dhangarwada to Ussap Harijanwada in V.P. of latmabarcem and Mencurem -Dhumse in Bicholim constituency.
137.00
XXV
11
Strengthening of various internal roads in Vatubangadi Nagar in Curchorem constituency.
180.00
In addition to the above, there are various other new schemes proposed to be taken up in the State, in the Annual Plan 2013-14. New schemes will be taken up as per the priority and approval of the Government.
 
 
4.2. RURAL ROADS (SPECIAL COMPONENT (SC) SUB-PLAN):
 
B. SPILLOVER WORKS OF THE YEAR 2012-13: The spillover works of the year 2012-13 in the Annual Plan 2013-14 is as follows:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
14
XXV
1
Improvement and black topping of the link road between Mudkud and Betul in V.P. Agonda in Canacona
23.77
In addition to the above, there are various other spillover works in the State, of the year 2012-13 in the Annual Plan 2013-14.
 
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2013-14: The following new schemes are proposed to be taken up in the Annual Plan 2013-14:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
15
VI
1
Imp. and wid. Of road by hotmixing at Andora in Navelim Const.
87.66
VI
2
Imp. of various road in V.P. Velsao, Cansaulim & Cortalim under Cortalim Const.(SC-SUB PLAN)
437.75
XVIII
3
Imp. & BT of road to Gandhinagar & Guddemol in V.P. Sanvordem in Sanvordem Constituency
49.50
XXIII
4
Construction of culvert at Harijanwada inV.P. Advalpal in Bicholim constituency.
29.45
In addition to the above, there are various other new schemes proposed to be taken up in the State, in the Annual Plan 2013-14. New schemes will be taken up as per the priority and approval of the Government.
 
4.3. RURAL ROADS (TRIBAL (ST) SUB-PLAN):
 
A. SCHEMES COMPLETED DURING THE YEAR 2012-13: The following schemes were completed during the year 2012-13:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
16
XVIII
1
Providing hot mix carpet to the road from SH-7 to Anandwadi & internal roads of Anandwadi in a combined length of 2.00Kms in V.P.Sanvordem in Sanvordem Constituency
61.68
XVIII
2
Improvement & blacktopping of the road from Cuncoliem to Keri in Priol Constituency
109.72
B. SPILLOVER WORKS OF THE YEAR 2012-13: The spillover works of the year 2012-13 in the Annual Plan 2013-14 is as follows:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
17
XIII
1
Improvement & hotmixing of road from Main road at Bellavista to 20 Point Programmer in V.P. Sangolda in Saligao Constituency.
40.84
XVIII
2
Improvement of road from Caitan's house at Mharwada to Navadurga Temple of Madkaim including jogging track in Madkai V.P. in Marcaim Constituency
496.20
XVIII
3
Improvement & B.T. of left out internal roads in V.P. Collem in Sanvordem Constituency
396.58
XXV
4
Construction of road to upper Badsarem in a length of 1350.00mttrs in V.P. Gaodongrem in Poinguinim.
67.11
XXV
5
Improvement of road leading Mudkud and Mirandwada by providing hotmix carpet in a length of 5.57kms in V.P. Agonda in Canacona constituency.
149.42
In addition to the above, there are various other spillover works in the State, of the year 2012-13 in the Annual Plan 2013-14.
 
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2013-14: The following new schemes are proposed to be taken up in the Annual Plan 2013-14:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
18
VI
1
Hotmixing and widening of road at St. Cruz to Bonit Bar and road leading to St. Jacinto Island in V.P. Chicalim in Cortalim Const under Tribal sub plan.
76.19
VI
2
Wid & Prov hotmix carpet to internal road in V. P. Ambaulim under S.T. Sub Plan.
165.45
VI
3
Improvement of side drains and providing protection wall at Velipwaddo in V.P. Balli, Cuncolim Constituency.(Under ST sub Plan)
82.00
VI
4
Widening & providing Hotmix carpet on left out roads in V.P. Ambaulim in Cuncolim Constituency.(Under ST sub Plan)
92.00
XVIII
5
Strengthening of the road by providing hot mix carpet to the internal roads in a combined length of 5.835 km. in V.P.Dharbandora in Sanvordem Constituency
285.64
XVIII
6
Improvement and providing parking to the tourist vehicle at Collem Dudhsagar road along with adjacent roads in V.P. Dharbandora in Sanvordem Constituency
485.20
XXV
7
Construction of road from Paryemol ti Kudai in Khola village Panchayat.
235.93
XXV
8
Widening and improvement of road from Shristhal to Vaizawada , Nuvem in V.P. Shristhal in Canacona
140.00
In addition to the above, there are various other new schemes proposed to be taken up in the State, in the Annual Plan 2013-14. New schemes will be taken up as per the priority and approval of the Government.
 
5. MINING ROADS:
 
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2013-14: The following new schemes are proposed to be taken up in the Annual Plan 2013-14:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
21
XVIII
1
Widening & Strengthening of road SH-7 from Guddemol junction to Sanvordem Tisk from Ch.14.30Kms to 18.10Kms in a length of 3.80 Kms in V.P.Sanvordem Constituency
682.00
XVIII
2
Widening & strengthening of road SH-7 from Savargal junction to Guddemol junction from Ch. 10.30kms to 14.30kms in a length of 4.00 kms in V.P.Kirlapal Dabal in Sanvordem Constituency
610.00
In addition to the above, there are various other new schemes proposed to be taken up in the State, in the Annual Plan 2013-14. New schemes will be taken up as per the priority and approval of the Government.
 
 
6. TOURISTIC ROADS:
 
A. SCHEMES COMPLETED DURING THE YEAR 2012-13: The following schemes were completed during the year 2012-13:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
22
XVIII
1
Widening & improvement of road from Molpona to Bolcornem leading to world heritage site of Tambdisurla temple in V.P.Sancordem in Sanvordem Constituency
85.37
B. SPILLOVER WORKS OF THE YEAR 2012-13: The spillover works of the year 2012-13 in the Annual Plan 2013-14 is as follows:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
23
XIII
1
Construction of concrete side drains and footpaths along road from Sinquerim Junction to Calangute Beach in Calangute Constituency
382.64
In addition to the above, there are various other spillover works in the State, of the year 2012-13 in the Annual Plan 2013-14.
 
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2013-14: The following new schemes are proposed to be taken up in the Annual Plan 2013-14:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
24
II
1
Widening and hotmixing of road from Siridao NH-17 junction to Kondo via Siridao beach to Jesus Nazereth Waddo in Village Panchayat of Siridao Pallem in St. Andre Constituency.
125.00
II
2
wwidening and improvement of road leading to Pillar Monastry in St. Andre Constituency
110.00
VI
3
Imp. of riding quality of main roads of Touristic Importance in V.P. Benaulim in Benaulim Const.
212.67
VI
4
Imp. and Strengthening of various beach roads in Betalbatim in Benaulim Const.
129.96
XIII
5
Improvement and hot mixing of the MDR-7 from DMC college Church junction to Anjuna Beach in V.P. Anjuna-Caisua and Assagao in Siolim Constituency
589.10
XIII
6
Improvemet and hot mixing of the MDR-7 from St.Michael Church junction to Vagator Bech and Shapora-Caisua in V.P.Anjuna-Caisua in Siolim Constituecy(part II)
605.74
XVIII
7
Providing hot mix carpet to the road from Dharge to Tambadisurla leading to world heritage site of Tambadisurla temple including internal roads to Dharge & Tambadiwada in a combined length of 3.75Km. in V.P.Sancordem in Sanvordem Constituency
192.57
XVIII
8
Providing hot mix carpet to the road from Dharge to Tambadisurla leading to world heritage site of Tambadisurla temple including internal roads to Dharge & Tambadiwada in a combined length of 3.75Km. in V.P.Sancordem in Sanvordem Constituency
192.57
In addition to the above, there are various other new schemes proposed to be taken up in the State, in the Annual Plan 2013-14. New schemes will be taken up as per the priority and approval of the Government.
 
7. CENTRAL ROAD FUND:
 
A. SCHEMES COMPLETED DURING THE YEAR 2012-13: The following schemes were completed during the year 2012-13:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
25
XIII
1
Construction of 5 cell box culvert including approaches at chainage 10.4km on MDR-18 Chopdem-Keri at Mithagar Arambol in V.P.Arambol under Mandrem Constituency.
206.44
XXIII
2
Widening in to 2 lane & improvement of S.H.NO 1 between km 28.00 to km 37.600 from Honda to Valpoi in a length of 9.60 kms in Satteri Taluka Goa
600.00
B. SPILLOVER WORKS OF THE YEAR 2012-13: The spillover works of the year 2012-13 in the Annual Plan 2013-14 is as follows:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
26
XIII
1
Widening & Improvement of M.D.R No.8 from Mapusa to Saligao(CHOGM) in a length of 5.80 km in Saligao Constituency
525.93
In addition to the above, there are various other spillover works in the State, of the year 2012-13 in the Annual Plan 2013-14.
 
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2013-14: The following new schemes are proposed to be taken up in the Annual Plan 2013-14:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
27
VI
1
Imp. & wid. Of road (MDR) from Cansaulim Verna linking to NH 17 at Goa State.
379.73
In addition to the above, there are various other new schemes proposed to be taken up in the State, in the Annual Plan 2013-14. New schemes will be taken up as per the priority and approval of the Government.
 
8. WESTERN GHATS DEVELOPMENT PROGRAMME:
 
A. SCHEMES COMPLETED DURING THE YEAR 2012-13: The following schemes were completed during the year 2012-13:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
28
XVIII
1
Reconstruction of damaged 2nos. of culverts at Colsai and 1no. of culvert at Kirlapalwada in V.P.Kirlapal Dabal in Sanvordem Constituency
51.21
B. SPILLOVER WORKS OF THE YEAR 2012-13: The spillover works of the year 2012-13 in the Annual Plan 2013-14 is as follows:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
29
XVIII
1
Improvement and repairs to 10 Nos. of culverts on Bolcornem to Tambdi Surla Temple road in Sanvordem Constituency
72.42
In addition to the above, there are various other spillover works in the State, of the year 2012-13 in the Annual Plan 2013-14.
 
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2013-14: The following new schemes are proposed to be taken up in the Annual Plan 2013-14:
Sr. No.
WD
SR. NO.
NAME OF THE SCHEME AS PER AA & ES ORDER
COST ON COMPLETION IN LAKHS
30
XVIII
1
Imp. & BT of road from Navem to Satlavane in a length of 900mts in V.P.Sancordem in Sanvordem Constituency
44.50
XVIII
2
Reconstruction of 2Nos. of culverts at Navem & Odkarwada on road from Udhalshe to Kumbharwada in V.P.Sancordem in Sanvordem Constituency
38.50
In addition to the above, there are various other new schemes proposed to be taken up in the State, in the Annual Plan 2013-14. New schemes will be taken up as per the priority and approval of the Government.
 